Who can do it
No role includes
catalog.cost.read, not even Owner: it is always granted explicitly, member by member. Holding it does not let anyone change costs or units. See Roles and permissions.
Where costs appear
Amounts, currencies and minor units
muveya stores every amount as a whole number of the currency’s minor units, such as cents, together with a three-letter uppercase ISO 4217 currency code. This keeps amounts exact.- In the console you type the amount in normal units: digits, optionally followed by a decimal point or comma and at most as many decimals as the currency uses (two for USD and BRL, none for CLP). Do not use thousands separators:
1250.50is valid,1,250.50is not. The console converts the amount to minor units exactly and never guesses the currency. - In CSV files and the API the amount is already in minor units: a whole number such as
1200. 0is a valid cost and is different from having no cost. Negative amounts are not accepted.
Record a cost
1
Open the supply
Go to Catalog and click the supply name.
2
Find the Supply cost section
It is at the bottom of the page: Cost changes are saved separately and keep their history. The line Cost per followed by the unit, for example Cost per Box, tells you which base unit the amount will apply to.
3
Enter the amount and currency
Type the Amount (Choose a currency and enter the amount without thousands separators.) and the Currency, for example
USD. If the supply already has a cost, both fields start with it.4
Save
Click Save cost. Cost saved confirms it.
- The previous cost, if any, is closed and kept in the history.
- The new amount becomes the current cost from that moment.
- The cost is tied to the supply’s unit as it was when you reviewed it. If the unit changed in the meantime, nothing is saved and the form says The unit you reviewed has changed. Review the current unit before confirming this amount., then Current unit: with the unit and a Review cost for the current unit button. Click it, check the amount and save again.
Cost states
Every read that includes a cost also includescostStatus. Read the state before using the amount.
A
review_required cost usually appears after someone changes the supply’s unit while it is still editable. See Catalog items.
Two more messages can appear where a cost would be:
- Cost information is unavailable.: you have the permission but the cost could not be read. Reload the page.
- The recorded unit is unavailable.: the amount is shown but its unit basis is missing.
Cost history
Every time a cost is replaced, the previous one is closed and stored with its amount, currency, the moment it took effect, who recorded it and the unit it applied to. The history is append-only: nothing in it is edited or deleted. The current release has no screen, API operation or MCP tool to browse the cost history. Order lines keep the cost they copied, so past orders still show what was paid at the time.Redaction: who sees what
Costs are removed on the server, not hidden in the screen. For a reader withoutcatalog.cost.read:
- The fields
cost,currency,costStatusandcostMeasurementare absent from every catalog read: the console,GET /v1/catalog/items,GET /v1/catalog/items/{itemId}and the MCP toolcatalog.search. Absent means absent, never zero. - A CSV export does not contain the six cost columns at all.
- Order lines do not show their cost copy.
- Saving a cost never sends the amount back in the response.
orders.value.read. See Create and track orders.
This is how a cost looks in an API read by a key that holds catalog.cost:read:
unit, but the supply is now counted in pair, so the amount must be confirmed before it applies. costMeasurement names the unit, its version and the quantity rule (base_number_v1, whole numbers of the base unit) the amount was recorded for.
How orders use the cost
When someone adds a supply to a draft order, muveya copies the cost in effect at that moment onto the line, together with the SKU, name, unit, category and high-value flag.- Changing the cost later does not change lines already added.
- The order’s value is the sum of cost times requested quantity over the lines that have a cost, in the currency of the first of them.
- Approval rules with a minimum or maximum order value use that value, so supplies without a cost do not count toward it. See Order approval policy.
What the system records
- The current cost, with its currency, the moment it took effect, who recorded it and its unit basis.
- The closed previous costs, in the history.
- On each order line, the copied cost and currency.
What can go wrong
None of these errors applies the proposed change. Review the information before trying again.
Related pages
Catalog items
Supplies, units and statuses.
Import and export
Costs in CSV files.
Create and track orders
Where cost copies and order values appear.
Order approval policy
Approval rules based on order value.
Roles and permissions
Grant View supply costs.
API scopes
catalog:read and catalog.cost:read.